Joshualoaded Profile

 



Labels


advert banner

Tuesday 7 July 2020

FG To Shut Third Mainland Bridge For Six Months - Travel


AD:-Please Grow, Visit Our Blog Channel and start earning up to N500 Daily ( Joshualoaded.com.ng )



The Federal Government is set to shut the Third Mainland Bridge for six months starting from Friday, July 24.

This was confirmed by the Federal Controller of Works in Lagos, Olukayode Popoola.

According to him, consultations are ongoing for another phase of repair works to begin on the 11.8km bridge.

Popoola explained that the work will commence on the outward mainland section of the bridge, and the ministry is working with relevant agencies to perfect traffic during the period.

The bridge has gone through a series of repair works and was last shut in August 2018 for a three-day investigative maintenance check.

There have also been reports of some worn-out expansion joints on the structure, raising concerns over the state of the bridge.

This development will force motorists in Lagos who ply the bridge to begin making arrangements for alternative routes.

https://www.channelstv.com/2020/07/06/fg-to-shut-third-mainland-bridge-for-six-months/amp/?__twitter_impression=true
JLAds2

No comments:

Post a Comment


WELCOME TO JOSHUALOADED BLOG
-------------------------
Please Take Note Of Our comment policy Below 👇👇👇

👉 Hi, Your feedback is very important to us.

👉 Please Do not post spam comments, it will be immediately removed upon our review.

👉 Please Avoid including website URLs in your comments.

Recent Post

Reliable Web Hosting in Nigeria by DomainKing.NG
Ads3:

Copyright © 2023. Welcome to Joshualoaded Blog - All Rights Reserved
Proudly Designed By Joshualoaded Media